Thursday, July 3, 2014

The Fish.

The Fish.
    Ganesan started his work in earnest interest.He was Engineer in charge of a major project for HQ Eastern Air Command.Technical and administrative buildings were coming up in about 100 crore project out of which about 60 peccent works completed.The wokk site was at Laitkore Peak the highest place in Shillong.It was strange weather at Laitkore peak.Wind used to blow like a cyclone and rain heavily when Shillong was geting bright sun light.Incidently Chirapunji, the world's heaviest rainfall geting place was only about 60 km from there.The working condition was definetly very bad.Ganesan went through  the contract document thoroughly and under stood the terms and condition under which the work has to be completed.   Th contractor was paid 32 lakhs on running bills,totalling 18 times the last one being about 2 days before Ganesan joining.
   Ganesan called the contractor and requested for joint inspection and assessment of the works.Because in a running contract it is possible to make over payment which can be adjusted in subsquent bills.Payments are also permited for materials collected at sit which could have been shifted to other sites So Ganesan was right in calling for joint inspection and assessment.On completion of this it was found that the value of work executed was 28 lakhs only.In a running contract  of a major work making 2-3 lakhs over payment is not a serious mistake.But when the engineer is new he can not accept the over payment made during the previous incumbent.So he told the cotractor that the next payment will be made only after overcoming the present over payment.
     Perhaps the Fish which was trying to get into water.
    contd.......

No comments:

Post a Comment